Amellar Solutions:Digital Government Reality
Our Products
Revenue Generation System Geographic Information System Eleksyon & Geoleksyon E-Mamamayan: Information Kiosk
Search
PROCUREMENT RULES AND REGULATIONS

Government Procurement Reform Act 9184 (R.A. 9184)

H. No. 4809
S. No. 2248

Republic of the Philippines
Congress of the Philippines
Metro Manila
Twelth Congress
Second Regular Session

Begun and held in Metro Manila, on Monday, the twenty-second day of July, two thousand two.

[ REPUBLIC ACT NO. 9184 ]
AN ACT PROVIDING FOR THE MODERNIZATION, STANDARDIZATION AND REGULATION OF THE PROCUREMENT ACTIVITIES OF THE GOVERNMENT AND FOR OTHER PURPOSES

Be it enacted by the Senate and the House of Representatives of the Philippines in Congress assembled:


Articles:
ARTICLE X

POST-QUALIFICATION

SEC. 34. Objective and Process of Post-qualification. - Post-qualification is the stage where the bidder with the Lowest Calculated Bid, in the case of Goods and Infrastructure Projects, or the Highest Rated Bid, in the case of Consulting Services, undergoes verification and validation whether he has passed all the requirements and conditions as specified in the Bidding Documents.

If the bidder with the Lowest Calculated Bid or Highest Rated Bid passes all the criteria for post-qualification, his Bid shall be considered the "Lowest Calculated Responsive Bid," in the case of Goods and Infrastructure or the "Highest Rated Responsive Bid," in the case of Consulting Services. However, if a bidder fails to meet any of the requirements or conditions, he shall be "post-disqualified" and the BAC shall conduct the post-qualification on the bidder with the second Lowest Calculated Bid or Highest Rated Bid. If the bidder with the second Lowest Calculated Bid or Highest Rated Bid is post-disqualified, the same procedure shall be repeated until the Lowest Calculated Responsive Bid or Highest Rated Responsive Bid is finally determined.

In all cases, the contract shall be awarded only to the bidder with the Lowest Calculated Responsive Bid or Highest Rated Responsive Bid.

SEC. 35. Failure of Bidding. - There shall be a failure of bidding if:

  1. Approved Budget for the Contract;
  2. Instructions to Bidders, including criteria for eligibility, bid evaluation and post-qualification, as well as the date, time and place of the pre-bid Conference (where applicable), submission of bids and opening of bids;
  3. No bids are received;
  4. No bid qualifies as the Lowest Calculated Responsive Bid or Highest Rated Responsive Bid; or,
  5. Whenever the bidder with the highest rated/lowest calculated responsive bid refuses, without justifiable cause to accept the award of contract, as the case may be.

Under any of the above instances, the contract shall be re-advertised and re-bid. The BAC shall observe the same process and set the new periods according to the same rules followed during the first bidding. After the second failed bidding, however, the BAC may resort to negotiated procurement as provided for in Section 53 of this Act.

SEC. 36. Single Calculated/Rated and Responsive Bid Submission. - A single calculated/rated and responsive bid shall be considered for award if it falls under any of the following circumstances:

  1. If after advertisement, only one prospective bidder submits a Letter of Intent and/or applies for eligibility check, and meets the eligibility requirements or criteria, after which it submits a bid, which is found to be responsive to the bidding requirements;
  2. If after the advertisement, more than one prospective bider applies for eligibility check, but only one bidder meets the eligibility requirements or criteria, after which it submits a bid which is found to be responsive to the bidding requirements; or
  3. If after the eligibility check, more than one bidder meets the eligibility requirements, but only one bidder submits a bid, and its bid is found to be responsive to the bidding requirements.

In all instances, the Procuring Entity shall ensure that the ABC reflects the most advantageous prevailing price for the Government.


bar
Tue, 2 Dec 08
E-Government
PROCUREMENT RULES AND REGULATIONS
E-Government Government Procurement Reform Act 9184 (R.A. 9184)
E-Government Related Administrative Measures
E-Government Bids and Awards Committee Observers

LAWS & ISSUANCES
E-Government National Policy on Satellite Communications
E-Government Public Telecommunications Act - IRR
E-Government Satellite Communications Guidelines
E-Government Public Telecommunications Act

PERTINENT RULINGS
E-Government Telecoms Taxability
E-Government Fair Market Values
E-Government Tax Exemptions
E-Government Multiple Claimants - Government Land

CONCEPTS & POLICIES
E-Government Systems Analysis from an Information Perspective
E-Government Tax Reform
E-Government Government Information Infrastructures

PRESENTATIONS & SPEECHES
E-Government Managing ICT Outsourcing: The Antipolo GIS Experience
E-Government E-Government for City Informatization

WHITE PAPERS
E-Government Introduction to GIS

    Go to top

Home · About Us · Products & Services · Track Record · E -Government · Clients
Events · News · Job Opportunities · Feedback · Contact Us · Site Map